Ducting – 30th January
The ducting has now been mounted on the wall above the workbench.
The ducting has now been mounted on the wall above the workbench.
Some dropper cables fixed and an in depth investigation into a point problem.
Layout planning can take a very long time. and Avon Cuttings is no exception.
It was out with the measuring tape to capture some measurements so that we can capture the track plan.
The diversity of members was never so evident as in this weeks differing approaches to layout design.
Following a break to build the extension, work is resuming on the Dockland Layout.
Ken, Ray and Allan have a new assignment to bring Hilltown back to life.
After some initial discussion, focus is being given to baseboard design and track planning with AnyRail