Skip to content
Croydon Model Railway Society
  • Old Home
  • About Us
  • Layouts
    • Member Layouts
    • Society Layouts
    • Under Construction Layouts
      • Avon Sidings
      • Dockland
      • Purley
      • Blocks a Go Go
  • Events
  • Serendipity
  • Join Us
  • Contact Us
  • Toggle website search
Menu Close
  • Old Home
  • About Us
  • Layouts
    • Member Layouts
    • Society Layouts
    • Under Construction Layouts
      • Avon Sidings
      • Dockland
      • Purley
      • Blocks a Go Go
  • Events
  • Serendipity
  • Join Us
  • Contact Us
  • Toggle website search
Read more about the article The Last Point – 30th March

The Last Point – 30th March

  • Post author:Allan
  • Post published:31st March 2022
  • Post category:Dockland

Wiring the last point is challenging.

Continue ReadingThe Last Point – 30th March
Read more about the article On Point – 30th March

On Point – 30th March

  • Post author:Allan
  • Post published:31st March 2022
  • Post category:Blocks A Go Go

The first servo on Test Track 1

Continue ReadingOn Point – 30th March
Read more about the article Base Wiring – 23rd March

Base Wiring – 23rd March

  • Post author:Allan
  • Post published:24th March 2022
  • Post category:Layout with No Name

Basic wiring makes good progress.

Continue ReadingBase Wiring – 23rd March
Read more about the article End in Sight – 23rd March

End in Sight – 23rd March

  • Post author:Allan
  • Post published:24th March 2022
  • Post category:Dockland

The loco has almost made it to the end.

Continue ReadingEnd in Sight – 23rd March
Read more about the article Running-in Percy – 23rd March

Running-in Percy – 23rd March

  • Post author:Allan
  • Post published:24th March 2022
  • Post category:Blocks A Go Go

Percy's turn to be 'run-in' on the test track

Continue ReadingRunning-in Percy – 23rd March
Read more about the article Beyond a Simple Shuttle – 16th March

Beyond a Simple Shuttle – 16th March

  • Post author:Allan
  • Post published:16th March 2022
  • Post category:Blocks A Go Go

Thomas resumes service on Blocks A Go Go.

Continue ReadingBeyond a Simple Shuttle – 16th March
Read more about the article What We Need is More Wires – 16th March

What We Need is More Wires – 16th March

  • Post author:Allan
  • Post published:16th March 2022
  • Post category:Layout with No Name

I'm sure I heard a call for more wires - maybe not!

Continue ReadingWhat We Need is More Wires – 16th March
Read more about the article Inching down the Baseboard – 2nd March

Inching down the Baseboard – 2nd March

  • Post author:Allan
  • Post published:3rd March 2022
  • Post category:Dockland

Inch by inch, power is applied to the track, and the shunter moves forward.

Continue ReadingInching down the Baseboard – 2nd March
Copyright 2026 - Croydon Model Railway Society