Dockland
This is an O Gauge layout that is intended for display at exhibitions. 3D printing and advanced electronics will feature in this Dockland tableau.
This is an O Gauge layout that is intended for display at exhibitions. 3D printing and advanced electronics will feature in this Dockland tableau.
Trade isn't about goods. Trade is about information. Goods sit in the warehouse until information moves them.
Reconnecting the points to the mimic panel was the main job of the day.
Some dropper cables fixed and an in depth investigation into a point problem.
Following a break to build the extension, work is resuming on the Dockland Layout.
Malcolm C focussed on hiding the frog switching wiring on the double slip only to be interrupted to assist Ray in tracking down some problems on the CBUS control system.
Still working on trackwork - some led lights have been used to get the double slip wiring correct.
A class 08 makes its first appearance as testing of the trackwork continues.
Some serious woodwork to extend the baseboards and the sparkies deal with power surges.
The mimic panel is now under test and catch rails are being put in place along the dockside.