Richard hand built the first two arches of an embankment for the heritage incline. It took forever.
However that card built-prototype has been used for the basis of a 3D printed prototype that can easily be replicated, and height adjusted, along the length of the incline.
The next step is to experiment with brick textured plastic and paints.
![You are currently viewing Embankments – 26th January](https://croydonmrs.org.uk/wp-content/uploads/2023/01/pip-03-scaled.jpg)
IMG_6640